Product Details:
|
Usage: | Oil Gas Sewage Transport | Keyword: | ASTM A106 |
---|---|---|---|
Surface Treatment: | Black Painting, Varnish Painting, Anti-rust Oil, Hot Galvanized, 3PE Coating | Length: | 5.8m/6m/11.8m/12m Or Customized |
Size: | 1/2 Inch - 24 Inch | Trademark: | ST |
Technology: | Hot Rlloed | Material: | Carbon Steel |
Standard: | ASTM A106, ASTM A53, API 5L, DIN17175, DIN1629 | Thickness: | 4 - 70 Mm |
Wall Thickness: | SCH10-SCH160 | Technical: | ERW Seamless |
Specification: | HEA100-500,HEB100-500 | Special Pipe: | Thick Wall Pipe |
Highlight: | ANSI B36.10 seamless carbon steel pipe,Hot Finished seamless carbon steel pipe,SCH40 carbon seamless steel pipe |
product name
|
seamless steel pipe
|
China high quality ASTM A106/A53 Gr. carbon seamless steel pipe with black painting
|
Type
|
Seamless carbon steel pipe / Line Pipe
|
|
Materials
|
API 5L /A53 /A106 GRADE B and other material which client inquired
|
|
Size
|
Outer Diameter
|
Seamless:17-914mm 3/8"-36"
|
Wall Thickness
|
SCH10 SCH20 SCH30 STD SCH40 SCH60 XS SCH80
SCH100 SCH120 SCH140 SCH160 XXS |
|
Length
|
Single random length/Double random length
5m-14m,5.8m,6m,10m-12m,12m or as customer's actual request |
|
Ends
|
Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc.
|
|
Surface Treatment
|
Bare,Painting black,varnished,galvanized,anti-corrosion 3PE PP/EP/FBE coating
|
|
Technical Methods
|
Hot-rolled/Cold-rolled/Hot-expanded
|
|
Testing Methods
|
Pressure test,Flaw detection,Eddy current testing, Hydro static testing or Ultrasonic examination and also with chemical and
physical property inspection |
|
Packaging
|
Small pipes in bundles with strong steel strips,large pieces in loose; Covered with plastic woven
bags; Wooden cases;Suitable for lifting operation;Loaded in 20ft 40ft or 45ft container or in bulk; Also according to customer's requests |
|
Origin
|
China
|
|
Application
|
Conveying oil gas and water
|
|
Third Party Inspection
|
SGS BV MTC
|
|
Trade Terms
|
FOB CIF CFR
|
|
Payment Terms
|
FOB 30%T/T,70% before shipment
CIF 30% pre-payment and the balance to be paid before making shipment or Irrevocable 100% L/C at sight |
|
MOQ
|
1 ton
|
|
Supply Capacity
|
5000 T/M
|
|
Delivery Time
|
Usually within 10-45 days after receipt of advance payment
|
Contact Person: Mr. Gao Ben
Tel: +86-18068357371
Fax: 86-0510-88680060